| Motor Type and Construction | Motor phase, winding configuration, frame size, shaft arrangement, and insulation class | Two-phase hybrid stepper motor; common frame sizes include 42 mm, 57 mm, 60 mm, and 86 mm; insulation class B or higher | Review the motor datasheet, dimensional drawing, winding diagram, and sample inspection report | 8% |
| Step Angle and Positioning | Basic step angle and holding-position accuracy | 1.8° step angle is common; 0.9° versions are available for finer positioning. Confirm the stated accuracy for the complete motor and gearbox assembly | Check the datasheet and request a test record under the specified load and operating temperature | 8% |
| Torque Capability | Holding torque, pull-out torque, and output torque after gear reduction | Holding torque depends strongly on frame size and winding design. The geared output torque should be calculated from motor torque, gear ratio, efficiency, and service factor | Compare torque-speed curves and require a continuous-duty test at the intended speed and load | 15% |
| Gearbox Ratio | Available reduction ratio and ratio tolerance | Common miniature and industrial configurations typically cover approximately 3:1 to 100:1, depending on gearbox type and motor size | Verify the actual ratio from the gearbox drawing and measure input-to-output revolutions on samples | 7% |
| Gearbox Technology | Gearbox type, backlash, efficiency, noise, and service life | Planetary gearboxes generally offer compact size and relatively low backlash; worm gearboxes can provide high reduction and self-locking characteristics but usually have lower efficiency | Request backlash, efficiency, noise, rated-life, lubrication, and duty-cycle data for the selected gearbox | 12% |
| Speed and Operating Duty | Rated speed, maximum speed, acceleration profile, and duty cycle | Evaluate the complete geared motor rather than the motor alone. Continuous duty, intermittent duty, and start-stop operation should be separately specified | Run a test using the required acceleration, operating speed, load, and duty cycle; record temperature rise and missed steps | 8% |
| Thermal Performance | Winding temperature rise, surface temperature, and allowable ambient temperature | Confirm the declared insulation system and operating temperature range. Actual temperature rise must be checked at the intended current, speed, and load | Request thermal test conditions and use thermocouples or an infrared measurement method during sample testing | 8% |
| Mechanical Reliability | Shaft radial load, axial load, bearing arrangement, mounting tolerance, and gear wear | Rated radial and axial loads must exceed the application requirements with an appropriate safety margin. Shaft and mounting dimensions should remain within drawing tolerances | Review mechanical drawings, bearing specifications, dimensional inspection records, and endurance-test results | 10% |
| Quality Management | Quality system, incoming inspection, process controls, and final inspection coverage | An independently auditable ISO 9001 quality-management system is a useful baseline, but certification alone does not prove product performance | Request a current certificate, scope, audit validity, control plan, and sample final-inspection records | 10% |
| Compliance and Documentation | Restriction-of-hazardous-substances documentation, product declarations, safety files, and material traceability | Documentation should match the exact model and destination market. RoHS-related material declarations are commonly required for electrical and electronic products | Check model numbers, revision dates, test-laboratory details, declarations, and material-compliance records | 7% |
| Production and Supply Capacity | Monthly capacity, critical-process control, component availability, and production continuity | Capacity claims should be supported by production records and should cover magnets, windings, machining, gearbox assembly, and final testing | Review the production plan, equipment list, process flow, bottleneck analysis, and recent on-time delivery data | 5% |
| Sample and Mass-Production Consistency | Variation in torque, resistance, dimensions, noise, backlash, and current consumption | Acceptance limits should be defined before ordering. The same test method and fixtures should be used for samples and production batches | Conduct incoming inspection on multiple samples and compare results with the approved specification | 8% |
| Customization Capability | Ability to modify winding, shaft, connector, cable, gearbox ratio, mounting, encoder interface, and packaging | Customization should be supported by controlled drawings, engineering-change procedures, and documented approval samples | Request an engineering-change workflow, prototype schedule, revised drawings, and sample approval process | 5% |
| Commercial and After-Sales Support | Quotation clarity, warranty terms, response time, replacement policy, and technical support | The quotation should identify motor model, gearbox ratio, torque conditions, test method, packaging, delivery terms, warranty period, and exclusions | Use a written technical questionnaire and evaluate the completeness and consistency of the supplier’s response | 7% |